NOTICE OF NGCP MANUAL LOAD DROPPING

NGCP may implement Manual Load Dropping (MLD) today, April 25, 2022 starting 7:00PM – 8:00PM in the franchise areas of NONECO.

1900H 2.2MW
2000H 2.2M

Reason: Due to overloading of 138kv AMLAN- SAMBOAN LINE 2, emergency shutdown of PCPC.

MLD is projected to last until 8:00PM or earlier tonight. Schedule may be cancelled if system condition improves.


We apologize for the inconvenience caused by this. Thank you for your cooperation.

NOTICE OF NGCP MANUAL LOAD DROPPING