NOTICE OF NGCP MANUAL LOAD DROPPING
NGCP may implement Manual Load Dropping (MLD) today, April 25, 2022 starting 7:00PM – 8:00PM in the franchise areas of NONECO.
1900H 2.2MW
2000H 2.2M
Reason: Due to overloading of 138kv AMLAN- SAMBOAN LINE 2, emergency shutdown of PCPC.
MLD is projected to last until 8:00PM or earlier tonight. Schedule may be cancelled if system condition improves.
We apologize for the inconvenience caused by this. Thank you for your cooperation.
News and Events
BIDS
© Copyright 2021. Northern Negros Electric Cooperative. All right reserved.





