NOTICE OF NGCP MANUAL LOAD DROPPING

NGCP may implement Manual Load Dropping (MLD) today, April 26, 2022 starting 7:00PM – 8:00PM in the franchise areas of NONECO.

 
1900H 2.2MW
2000H 2.2M


Reason: Due to overloading of 138kv AMLAN- SAMBOAN LINE 2, emergency shutdown of PCPC.


MLD is projected to last until 8:00PM or earlier tonight . Schedule may be cancelled if system condition improves.


We apologize for the inconvenience caused by this. 

Thank you for your cooperation.

 

NOTICE OF NGCP MANUAL LOAD DROPPING